An owner who lives abroad sees the building through the site reports. A good report is more than a gallery of progress photographs. It shows the moments that decide whether the building is built as it was drawn.
The moments that matter
- The steel before a pour: the bars, their spacing and their cover checked against the structural drawings, before the concrete hides them
- The concrete as it arrives: a slump test at the truck, and cubes taken for the laboratory
- Each slab and each floor: the work checked against the drawings before the next one starts
- The services in the walls: pipes and ducts in place before plaster and ceilings close over them
- The handover: the snag list, with every item on it closed out

What to ask for
- Dated photographs, taken on the day, of the element the report names
- What was checked, against which drawing, and what was found
- What was put right, and when
- Where the site stands against the programme

On our sites, engineers check the steel before the pour, the concrete as it arrives and the work against the drawings. Between visits, the office answers on WhatsApp and by email, and video calls are Monday to Friday, 3 to 4 pm Gulf time.